{"title":"Investment cost analysis for electricity generation with renewable energy and measurement of water pressure from weir to water conservation of small hydropower project","authors":"C. Jaipradidtham","doi":"10.12720/SGCE.6.1.67-75","DOIUrl":null,"url":null,"abstract":"This research paper presents to study and analyzed the cost economics, for an investment to produce electricity with renewable energy of water from weir, and measurement of water pressure due to water conservation of community village area. In case study of the hydropower plant project, amphoe Makham, Chanthaburi province in Thailand, which this research will be design and test for electricity generation from hydropower, will be the real testing weir and considering based on the economics cost estimation. Analysis of economic and financial with selective approach to research and development projects that is appropriate to the economy. Thus, evaluation of economics cost indicators including the calculation of net present value, internal rate of return of this project (IRR), analysis of return on investment, benefit-cost ratio (B/C), average incremental costs or cost of energy, payback period time and cash flow value, etc. The results of measurement from water pressure and analyze the cost economics are will enough to bring to produce the electricity. The hydropower turbine size 7 MW have potential in electricity production is 38.45 GWh/year for economics evaluation meets that can payback get in period time is 12 year 5 month, the benefit-cost ratio on the investment is 1.34 and yield of the project or internal rate return to 13.28 %.","PeriodicalId":247617,"journal":{"name":"International Journal of Smart Grid and Clean Energy","volume":"84 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Smart Grid and Clean Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12720/SGCE.6.1.67-75","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

This research paper presents to study and analyzed the cost economics, for an investment to produce electricity with renewable energy of water from weir, and measurement of water pressure due to water conservation of community village area. In case study of the hydropower plant project, amphoe Makham, Chanthaburi province in Thailand, which this research will be design and test for electricity generation from hydropower, will be the real testing weir and considering based on the economics cost estimation. Analysis of economic and financial with selective approach to research and development projects that is appropriate to the economy. Thus, evaluation of economics cost indicators including the calculation of net present value, internal rate of return of this project (IRR), analysis of return on investment, benefit-cost ratio (B/C), average incremental costs or cost of energy, payback period time and cash flow value, etc. The results of measurement from water pressure and analyze the cost economics are will enough to bring to produce the electricity. The hydropower turbine size 7 MW have potential in electricity production is 38.45 GWh/year for economics evaluation meets that can payback get in period time is 12 year 5 month, the benefit-cost ratio on the investment is 1.34 and yield of the project or internal rate return to 13.28 %.
可再生能源发电投资成本分析及小水电工程堰水压力测量
本文对社区村区利用堰水可再生能源投资发电、节水用水压力测量的成本经济学进行了研究和分析。以泰国占武里省amphoe Makham水电站项目为例,本研究将对该水电站进行水电发电的设计和试验,并根据经济成本估算进行实际试验堰的考虑。经济和金融分析与选择的方法,研究和发展项目,是适合的经济。因此,经济成本评价指标包括净现值计算、项目内部收益率(IRR)、投资回报率分析、效益成本比(B/C)、平均增量成本或能源成本、投资回收期时间、现金流价值等。从水压测量和成本经济学分析的结果将足以带来的生产电力。经经济评价符合可回收期为12年5个月,投资效益成本比为1.34,项目收益率或内部收益率为13.28%的规模7mw水轮机发电潜力为38.45 GWh/年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信