M. Pick, H. Altmann, P. Andrew, G. Celentano, C. Froger, J. Graham, F. Hurd, G. Israel, P. Lomas, B. Macklin, E. Martin, R. Middleton, P. Miele, R. Mohanti, P. Noll, W. Parsons, A. Peacock, L. Rossi, C. Sborchia, S. Scott, J. Tait
{"title":"The new first wall configuration of JET","authors":"M. Pick, H. Altmann, P. Andrew, G. Celentano, C. Froger, J. Graham, F. Hurd, G. Israel, P. Lomas, B. Macklin, E. Martin, R. Middleton, P. Miele, R. Mohanti, P. Noll, W. Parsons, A. Peacock, L. Rossi, C. Sborchia, S. Scott, J. Tait","doi":"10.1109/SFE.1993.472785","DOIUrl":null,"url":null,"abstract":"The installation of the pumped divertor into the JET machine during 1992-1993 includes a total refurbishing of most of the in-vessel components and a new first wall configuration. The paper describes the new components, and the requirements which were implemented in the design. These include the requirements related to normal plasma operation and off-normal effects such as disruptions as well as those related to installation and alignment.","PeriodicalId":387034,"journal":{"name":"15th IEEE/NPSS Symposium on Fusion Engineering - Supplement,","volume":"95 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"15th IEEE/NPSS Symposium on Fusion Engineering - Supplement,","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SFE.1993.472785","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
The installation of the pumped divertor into the JET machine during 1992-1993 includes a total refurbishing of most of the in-vessel components and a new first wall configuration. The paper describes the new components, and the requirements which were implemented in the design. These include the requirements related to normal plasma operation and off-normal effects such as disruptions as well as those related to installation and alignment.