{"title":"Analysis Of Inhibition Of Fertilizer Unloading Process Bulk Urea In MV.Abusamah At The Pier Tanjung Wangi Banyuwangi","authors":"Kodrat Alam, Muhammad Mahdi, Trio Adi Rohmanto","doi":"10.54249/iwj.v4i2.72","DOIUrl":null,"url":null,"abstract":"The delay in the process of unloading bulk urea is a problem that often occurs at PT. Pupuk Indonesia Logistik, especially in MV. Abusamah is one of the ships owned by PT. Pupuk Indonesia Logistik. In the activity of unloading bulk urea fertilizer at the Tanjung Wangi pier, Banyuwangi MV.Abusamah often experiences delays, this can cause losses for the company. This research purpose to determine the factors causing the delay in the process of unloading bulk urea fertilizer and the efforts made to prevent it. The research method used is descriptive qualitative research method. Sources of research data taken from primary data and secondary data. Data collection techniques by observation, interviews and literature study. From the results of the study, there are several factors that affect the delay in the process of unloading urea in MV.Abusamah at the Tanjung Wangi pier, Banyuwangi and several efforts that have been made by the company in overcoming these problems. The conclusion is implementation of the process of unloading urea fertilizer at the Tanjung Wangi pier in Banyuwangi by MV.Abusamah is often hampered because it is influenced by several factors, namely inadequate unloading equipment, weather factors, namely rain, and limited capacity land conveyor. Efforts were made to delay the unloading of bulk urea fertilizer by increasing the number of transportation facilities, namely trucks which are one of the supporting tools in unloading activities, sending updated weather forecast news from BMKG to the DPA/HSSE department, and adding storage warehouse capacity.","PeriodicalId":252040,"journal":{"name":"IWJ : Inland Waterways Journal","volume":"100 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IWJ : Inland Waterways Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54249/iwj.v4i2.72","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The delay in the process of unloading bulk urea is a problem that often occurs at PT. Pupuk Indonesia Logistik, especially in MV. Abusamah is one of the ships owned by PT. Pupuk Indonesia Logistik. In the activity of unloading bulk urea fertilizer at the Tanjung Wangi pier, Banyuwangi MV.Abusamah often experiences delays, this can cause losses for the company. This research purpose to determine the factors causing the delay in the process of unloading bulk urea fertilizer and the efforts made to prevent it. The research method used is descriptive qualitative research method. Sources of research data taken from primary data and secondary data. Data collection techniques by observation, interviews and literature study. From the results of the study, there are several factors that affect the delay in the process of unloading urea in MV.Abusamah at the Tanjung Wangi pier, Banyuwangi and several efforts that have been made by the company in overcoming these problems. The conclusion is implementation of the process of unloading urea fertilizer at the Tanjung Wangi pier in Banyuwangi by MV.Abusamah is often hampered because it is influenced by several factors, namely inadequate unloading equipment, weather factors, namely rain, and limited capacity land conveyor. Efforts were made to delay the unloading of bulk urea fertilizer by increasing the number of transportation facilities, namely trucks which are one of the supporting tools in unloading activities, sending updated weather forecast news from BMKG to the DPA/HSSE department, and adding storage warehouse capacity.
散装尿素卸载过程的延迟是PT. Pupuk Indonesia Logistik经常发生的问题,特别是在MV。Abusamah是PT. Pupuk Indonesia logistics旗下的一艘船。在丹绒旺吉码头卸散装尿素肥料的活动中,Banyuwangi MV。Abusamah经常遇到延误,这可能会给公司造成损失。本研究旨在确定造成散装尿素肥料卸料延误的因素及预防措施。研究方法采用描述性定性研究方法。从主要数据和次要数据中获取的研究数据来源。通过观察法、访谈法和文献研究法收集数据。从研究结果来看,影响MV卸载尿素过程延迟的因素有几个。Abusamah在Tanjung Wangi码头,Banyuwangi以及该公司为克服这些问题所做的几项努力。结论是在Banyuwangi Tanjung Wangi码头实施MV卸载尿素肥的过程。Abusamah经常受到阻碍,因为它受到几个因素的影响,即卸载设备不足,天气因素,即下雨,以及容量有限的陆地输送机。通过增加运输设施,即卡车作为卸载活动的辅助工具之一,通过BMKG向DPA/HSSE部门发送最新的天气预报消息,增加仓储容量,努力延迟散装尿素肥料的卸载。