{"title":"Fast optimization method for service restoration in sub-transmission systems with priority loads","authors":"I. Watanabe, A. Takehara, Y. Nakachi, S. C. Verma","doi":"10.1109/TD-ASIA.2009.5356898","DOIUrl":null,"url":null,"abstract":"This paper proposes a new optimization method for service restoration in sub-transmission systems. The proposed method has some functions to ensure feasible switching operations and to speed up the optimization process. To adequately assess the unrestored total power after network switching operation, we model it as a restoration priority constrained maximum subset-sum problem. Moreover, the method uses only three promising candidates for the final radial configuration to speed up the process. Computational results with a test sub-transmission system show that the proposed method can find better solutions faster than the existing method.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356898","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper proposes a new optimization method for service restoration in sub-transmission systems. The proposed method has some functions to ensure feasible switching operations and to speed up the optimization process. To adequately assess the unrestored total power after network switching operation, we model it as a restoration priority constrained maximum subset-sum problem. Moreover, the method uses only three promising candidates for the final radial configuration to speed up the process. Computational results with a test sub-transmission system show that the proposed method can find better solutions faster than the existing method.
具有优先负荷的子传输系统业务恢复的快速优化方法
提出了一种新的分输电系统业务恢复优化方法。该方法对保证切换操作的可行性和加快优化过程具有一定的作用。为了充分评估网络交换操作后未恢复的总功率,我们将其建模为恢复优先级约束的最大子集和问题。此外,该方法仅使用三个有希望的候选径向构型来加快过程。通过一个测试子传输系统的计算结果表明,该方法比现有方法能更快地找到更好的解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信