Risk Management Metrics

Rimsy Dua, Samiksha Sharma, Rohit Kumar
{"title":"Risk Management Metrics","authors":"Rimsy Dua, Samiksha Sharma, Rohit Kumar","doi":"10.4018/978-1-5225-6029-6.CH002","DOIUrl":null,"url":null,"abstract":"This chapter describes how risk management deals with the detection, the evaluation and the precedence of the risks in the process of project management. There is always an uncertainty factor related to the decisions of an investment while managing a project. Risk management is a proactive approach to deal with such future events that can lead to slow performance of the software project management. For successful risk management; there are different metrics that have been used in the past and are being getting used in the present for inspecting the progress of a project at specific points in a timeline that help in reducing the amount of risk. For the adoption of effective metrics for risk management, data is required. All of the metrics can be applied to the different domains of project, process and product. The chapter also covers strategies to advance, distinguish, estimate, and forecast the risk management process. A review of the key point indicators (KPIs) are also integrated along with the project metrics to signify the future and the present renderings.","PeriodicalId":429458,"journal":{"name":"Research Anthology on Agile Software, Software Development, and Testing","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Research Anthology on Agile Software, Software Development, and Testing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/978-1-5225-6029-6.CH002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This chapter describes how risk management deals with the detection, the evaluation and the precedence of the risks in the process of project management. There is always an uncertainty factor related to the decisions of an investment while managing a project. Risk management is a proactive approach to deal with such future events that can lead to slow performance of the software project management. For successful risk management; there are different metrics that have been used in the past and are being getting used in the present for inspecting the progress of a project at specific points in a timeline that help in reducing the amount of risk. For the adoption of effective metrics for risk management, data is required. All of the metrics can be applied to the different domains of project, process and product. The chapter also covers strategies to advance, distinguish, estimate, and forecast the risk management process. A review of the key point indicators (KPIs) are also integrated along with the project metrics to signify the future and the present renderings.
风险管理指标
本章描述了风险管理在项目管理过程中如何对风险进行检测、评估和排序。在管理项目时,总是存在与投资决策相关的不确定性因素。风险管理是一种前瞻性的方法,用于处理可能导致软件项目管理缓慢执行的未来事件。成功的风险管理;有不同的度量标准在过去和现在被用来检查在时间轴上的特定点上的项目进度,这有助于减少风险。为了采用有效的风险管理度量标准,需要数据。所有的度量标准都可以应用于项目、过程和产品的不同领域。本章还涵盖了推进、区分、估计和预测风险管理过程的策略。关键点指标(kpi)的回顾也与项目指标集成在一起,以表示未来和当前的渲染。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信