Results from the First Year Operation of Project EHV

P. A. Abetti, J. Laforest, C. Lindh, D. Maccarthy
{"title":"Results from the First Year Operation of Project EHV","authors":"P. A. Abetti, J. Laforest, C. Lindh, D. Maccarthy","doi":"10.1109/AIEEPAS.1962.4501467","DOIUrl":null,"url":null,"abstract":"Project EHV was operated successfully and almost continuously at the 500-kv level for the first year of tests starting in December 1960; operation is continuing. A maximum voltage of 770 kv was attained. Corona loss and radio influence (RI) performance were very satisfactory. Corona loss at the 500-kv operating level was negligible during fair weather. Correlation has been established between values of corona loss, RI, and audible sound measured simultaneously.","PeriodicalId":118797,"journal":{"name":"Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1962-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AIEEPAS.1962.4501467","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

Project EHV was operated successfully and almost continuously at the 500-kv level for the first year of tests starting in December 1960; operation is continuing. A maximum voltage of 770 kv was attained. Corona loss and radio influence (RI) performance were very satisfactory. Corona loss at the 500-kv operating level was negligible during fair weather. Correlation has been established between values of corona loss, RI, and audible sound measured simultaneously.
超高压项目第一年运行的结果
在1960年12月开始的第一年测试中,超高压项目成功运行,几乎连续运行在500千伏水平;行动仍在继续。最高电压达到了770千伏。电晕损耗和无线电影响(RI)性能非常令人满意。在天气晴朗时,500kv工作电平的电晕损耗可以忽略不计。同时测量的电晕损耗值、RI值和可听声音之间建立了相关性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信