{"title":"A Study on Skip Flow Shop Scheduling Considering with a Cutting Process in Reinforcing Bar Manufacturing","authors":"H. Arai, Harumi Haraguchi","doi":"10.1109/IEEM44572.2019.8978565","DOIUrl":null,"url":null,"abstract":"In recent years, technical innovation is also expanded in the field of housing construction. The unit basic reinforcing rod system (BRS) is one of important innovation of “layout of reinforcement bar process” in the making of the housing base. This process was performed by handwork in the past, many housing construction sites are using BRS at now. The BRS is made in factory and production process are complicated. Therefore, the process systematization is behind. A manufacturing premise of BRS is regarded as a flow shop system that the lot sizing condition is different every process. In addition, the first process of BRS is a cutting process. It is also important for making of BRS. In this study, an efficient scheduling method is proposed using the priority of the lot sizing condition and a cutting process.","PeriodicalId":255418,"journal":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM44572.2019.8978565","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In recent years, technical innovation is also expanded in the field of housing construction. The unit basic reinforcing rod system (BRS) is one of important innovation of “layout of reinforcement bar process” in the making of the housing base. This process was performed by handwork in the past, many housing construction sites are using BRS at now. The BRS is made in factory and production process are complicated. Therefore, the process systematization is behind. A manufacturing premise of BRS is regarded as a flow shop system that the lot sizing condition is different every process. In addition, the first process of BRS is a cutting process. It is also important for making of BRS. In this study, an efficient scheduling method is proposed using the priority of the lot sizing condition and a cutting process.