Zhang Chengjun, Zhu Jianwen, Li Juan, Shi Jianjun, Guo-ying Wei
{"title":"Research on Treatment of Lining Cracks of Small Section Water Diversion Tunnel","authors":"Zhang Chengjun, Zhu Jianwen, Li Juan, Shi Jianjun, Guo-ying Wei","doi":"10.25236/ajage.2023.050508","DOIUrl":null,"url":null,"abstract":": Diversion tunnel is a common project in hydropower construction, in which cracks on concrete lining are common. Often accompanied by the water seepage, the cracks seriously damage the safety of the concrete structure and directly affect the service life of the tunnel. Dealing with the cracks is time-consuming and labor-intensive, so it increases the cost of investment and affects the construction period. Taking the 25 diversion tunnel of the construction of the Yellow River Diversion Project in the central part of Shanxi Province as an example, the cause of the cracks is analyzed based on the construction experience, and the corresponding treatment methods are proposed, which are of great significance to the quality of the project.","PeriodicalId":441364,"journal":{"name":"Academic Journal of Architecture and Geotechnical Engineering","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Academic Journal of Architecture and Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25236/ajage.2023.050508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
: Diversion tunnel is a common project in hydropower construction, in which cracks on concrete lining are common. Often accompanied by the water seepage, the cracks seriously damage the safety of the concrete structure and directly affect the service life of the tunnel. Dealing with the cracks is time-consuming and labor-intensive, so it increases the cost of investment and affects the construction period. Taking the 25 diversion tunnel of the construction of the Yellow River Diversion Project in the central part of Shanxi Province as an example, the cause of the cracks is analyzed based on the construction experience, and the corresponding treatment methods are proposed, which are of great significance to the quality of the project.