Quantitative approaches for walking accessibility of metro stations

Q. Zhan, Xingang Zhou, Yinghui Xiao
{"title":"Quantitative approaches for walking accessibility of metro stations","authors":"Q. Zhan, Xingang Zhou, Yinghui Xiao","doi":"10.1109/IACP.2012.6342967","DOIUrl":null,"url":null,"abstract":"In China, many metropolises (such as Beijing, Shanghai, Guangzhou, Wuhan) are developing metro railway systems to relieve traffic jam. Due to lack of quantitative analysis tools for comparison of different options, planners have to make decision for metro station locations mainly based on their experiences and qualitative approaches which are considered unreliable to a certain extent. Therefore, we present a number of quantitative methods and measures based on GIS in this research. A case study has been conducted in Wuhan to test the effectiveness of these methods and quantitative measures. Luxiang Roundabout area in Wuhan where six major roads intersect, is inflicted with heavy traffic jam. To reduce the traffic volume, Guanggu metro station has been under construction nearby. We implement three methods to determine the service area of Guanggu metro station: buffer analysis, network analysis and Cost Distance analysis. After comparison, Cost Distance analysis is proven to be a more accurate and reliable way to analyze walking accessibility and service area of a metro station. Then, we measure and compare the amount of accessible area, building footprint area, building floor space within different walking time to the metro station under construction and a possible alternative location with station located in the center of the roundabout. The latter one offers a better choice in terms of walking accessibility.","PeriodicalId":125711,"journal":{"name":"2012 6th International Association for China Planning Conference (IACP)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 6th International Association for China Planning Conference (IACP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IACP.2012.6342967","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In China, many metropolises (such as Beijing, Shanghai, Guangzhou, Wuhan) are developing metro railway systems to relieve traffic jam. Due to lack of quantitative analysis tools for comparison of different options, planners have to make decision for metro station locations mainly based on their experiences and qualitative approaches which are considered unreliable to a certain extent. Therefore, we present a number of quantitative methods and measures based on GIS in this research. A case study has been conducted in Wuhan to test the effectiveness of these methods and quantitative measures. Luxiang Roundabout area in Wuhan where six major roads intersect, is inflicted with heavy traffic jam. To reduce the traffic volume, Guanggu metro station has been under construction nearby. We implement three methods to determine the service area of Guanggu metro station: buffer analysis, network analysis and Cost Distance analysis. After comparison, Cost Distance analysis is proven to be a more accurate and reliable way to analyze walking accessibility and service area of a metro station. Then, we measure and compare the amount of accessible area, building footprint area, building floor space within different walking time to the metro station under construction and a possible alternative location with station located in the center of the roundabout. The latter one offers a better choice in terms of walking accessibility.
地铁站步行可达性的定量方法研究
在中国,许多大城市(如北京、上海、广州、武汉)都在发展地铁系统,以缓解交通拥堵。由于缺乏对不同方案进行比较的定量分析工具,规划者对地铁车站的选址决策主要依靠自己的经验和定性方法,在一定程度上被认为是不可靠的。因此,在本研究中,我们提出了一些基于GIS的定量方法和措施。以武汉市为例,验证了这些方法和定量措施的有效性。武汉芦乡环岛是武汉六条主干道的交汇处,交通拥堵严重。为了减少交通流量,广谷地铁站已经在附近建设。本文采用缓冲分析、网络分析和成本距离分析三种方法来确定广谷地铁站的服务区域。通过对比,证明成本距离分析法是分析地铁站步行可达性和服务区域更为准确可靠的方法。然后,我们测量并比较了在不同步行时间内到正在建设的地铁站的可达面积、建筑足迹面积、建筑面积,以及一个可能的替代位置,车站位于环形交叉路口的中心。从步行的可达性来看,后者提供了更好的选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信