{"title":"A user peak load staggering potential assessment method based on three-demarcation analytic hierarchy process","authors":"Feng Zhai, Wei Cen, Jia Zhao, Peng Xu, Yi Sun","doi":"10.1109/SKIMA.2016.7916230","DOIUrl":null,"url":null,"abstract":"In the process of assigning peak-peak tasks to users, there are some problems such as uncertainty of assignment standard, mismatch of task and actual response. In order to provide more accurate distribution, so as to provide suggestion of implementing staggering power consumption to power grid enterprises, this paper uses the AHP method to evaluate the user peak load staggering potential. It selects the indicators related to the peak load staggering potential, constructs the potential evaluation system, allocates the peak load staggering resources according to the evaluation results, and judges the accuracy of the evaluation according to the task completion and so on. The validity of the potential evaluation method proposed in this paper is evaluated by experiment simulation.","PeriodicalId":417370,"journal":{"name":"2016 10th International Conference on Software, Knowledge, Information Management & Applications (SKIMA)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 10th International Conference on Software, Knowledge, Information Management & Applications (SKIMA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SKIMA.2016.7916230","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In the process of assigning peak-peak tasks to users, there are some problems such as uncertainty of assignment standard, mismatch of task and actual response. In order to provide more accurate distribution, so as to provide suggestion of implementing staggering power consumption to power grid enterprises, this paper uses the AHP method to evaluate the user peak load staggering potential. It selects the indicators related to the peak load staggering potential, constructs the potential evaluation system, allocates the peak load staggering resources according to the evaluation results, and judges the accuracy of the evaluation according to the task completion and so on. The validity of the potential evaluation method proposed in this paper is evaluated by experiment simulation.