P. Lezhnyuk, S. Kravchuk, I. Kotylko, N. Sobchuk, I. Hunko
{"title":"Modeling Of Electrical Supply Restoration In Local Electrical Systems After Loss Of Centralized Power","authors":"P. Lezhnyuk, S. Kravchuk, I. Kotylko, N. Sobchuk, I. Hunko","doi":"10.1109/IEPS.2018.8559583","DOIUrl":null,"url":null,"abstract":"Among the complex of tasks that arise in the process of implementation of IDE, it is expedient to study and solve first of all those that directly affect the reliability and quality of electricity supply of electricity consumers. In this paper, the possibility of using small hydroelectric power plant (HPP) and determination of their installed capacity for the supply and / or maintenance of an appropriate voltage level on photovoltaic (PV) buses is investigated. Analysis of the transient process that occurs during the loss of centralized power is carried out. The influence of PV generation on the quality of electricity in the event of loss of centralized power was positively influenced and the timing of the possible functioning of the forest, whose consumers are fed exclusively from renewable energy sources, were determined.","PeriodicalId":340150,"journal":{"name":"2018 IEEE 3rd International Conference on Intelligent Energy and Power Systems (IEPS)","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 3rd International Conference on Intelligent Energy and Power Systems (IEPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEPS.2018.8559583","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
Among the complex of tasks that arise in the process of implementation of IDE, it is expedient to study and solve first of all those that directly affect the reliability and quality of electricity supply of electricity consumers. In this paper, the possibility of using small hydroelectric power plant (HPP) and determination of their installed capacity for the supply and / or maintenance of an appropriate voltage level on photovoltaic (PV) buses is investigated. Analysis of the transient process that occurs during the loss of centralized power is carried out. The influence of PV generation on the quality of electricity in the event of loss of centralized power was positively influenced and the timing of the possible functioning of the forest, whose consumers are fed exclusively from renewable energy sources, were determined.