{"title":"Interconnect protection of dispersed generators","authors":"C. Mozina","doi":"10.1109/TDC.2001.971326","DOIUrl":null,"url":null,"abstract":"Much of the new generation capacity installed during the 21st century will be accomplished through the construction of IPP (independent power producer) facilities. These facilities can take the form of small dispersed generating units, or large capacity plants owned and even operated by non-utility personnel. This paper discusses the protection requirements to interconnect these generators to utility systems, as well as methods to reconnect these generators after interconnect protection tripping. The paper also discusses the limitations of present-day interconnection protection methods in addressing issues such as system generation support during major utility system disturbances.","PeriodicalId":182269,"journal":{"name":"2001 IEEE/PES Transmission and Distribution Conference and Exposition. Developing New Perspectives (Cat. No.01CH37294)","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"47","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 IEEE/PES Transmission and Distribution Conference and Exposition. Developing New Perspectives (Cat. No.01CH37294)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2001.971326","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 47

Abstract

Much of the new generation capacity installed during the 21st century will be accomplished through the construction of IPP (independent power producer) facilities. These facilities can take the form of small dispersed generating units, or large capacity plants owned and even operated by non-utility personnel. This paper discusses the protection requirements to interconnect these generators to utility systems, as well as methods to reconnect these generators after interconnect protection tripping. The paper also discusses the limitations of present-day interconnection protection methods in addressing issues such as system generation support during major utility system disturbances.
分散发电机的互连保护
21世纪安装的大部分新发电能力将通过IPP(独立发电商)设施的建设来完成。这些设施可以采用小型分散发电机组的形式,或者由非公用事业人员拥有甚至运营的大容量发电厂。本文讨论了这些发电机与电力系统互连的保护要求,以及互连保护跳闸后这些发电机重新连接的方法。本文还讨论了当前互连保护方法在解决重大公用事业系统干扰期间系统生成支持等问题方面的局限性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信