ANALISA OPTIMASI WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN PENANGANAN ROB ERETAN KABUPATEN INDRAMAYU JAWA BARAT

Agung Sutarto, Kharismawan Irfan Fauzy
{"title":"ANALISA OPTIMASI WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN PENANGANAN ROB ERETAN KABUPATEN INDRAMAYU JAWA BARAT","authors":"Agung Sutarto, Kharismawan Irfan Fauzy","doi":"10.53866/jimi.v3i1.101","DOIUrl":null,"url":null,"abstract":"In the planning of construction work, various things can happen in the implementation of construction projects which can cause an increase in implementation time so that the completion of the project becomes late. Delays in project work can be anticipated by accelerating implementation, but still paying attention to cost and quality factors. This study analyzed the acceleration of project duration in the implementation of the Indramayu Regency Eretan ROB Handling Development Project with the addition of working hours (overtime) which varied from 1 hour of overtime to 3 hours of overtime and with the addition of manpower using the time cost trade off method. From the normal cost of Rp. 20,778,458,753 and a duration of 307 days with the analysis of the time cost trade off method, it was concluded that the most efficient addition of overtime hours was the addition of 3 hours of overtime with a cost of Rp. 20,275,217,792 for a duration of 244 days and for the most efficient addition of labor was the addition of manpower to 3 hours of overtime work at a cost of Rp. 20,295,750,961 durations of 244. So that the results of the most efficient analysis are by adding 3 hours of overtime work with a difference from the normal cost of Rp. 503,240,961 and with a difference in duration of 63 days from the normal duration.","PeriodicalId":414894,"journal":{"name":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53866/jimi.v3i1.101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the planning of construction work, various things can happen in the implementation of construction projects which can cause an increase in implementation time so that the completion of the project becomes late. Delays in project work can be anticipated by accelerating implementation, but still paying attention to cost and quality factors. This study analyzed the acceleration of project duration in the implementation of the Indramayu Regency Eretan ROB Handling Development Project with the addition of working hours (overtime) which varied from 1 hour of overtime to 3 hours of overtime and with the addition of manpower using the time cost trade off method. From the normal cost of Rp. 20,778,458,753 and a duration of 307 days with the analysis of the time cost trade off method, it was concluded that the most efficient addition of overtime hours was the addition of 3 hours of overtime with a cost of Rp. 20,275,217,792 for a duration of 244 days and for the most efficient addition of labor was the addition of manpower to 3 hours of overtime work at a cost of Rp. 20,295,750,961 durations of 244. So that the results of the most efficient analysis are by adding 3 hours of overtime work with a difference from the normal cost of Rp. 503,240,961 and with a difference in duration of 63 days from the normal duration.
时间优化和成本分析,使用在ROB ERETAN区开发项目上的DURATION COST TRADE方法
在施工工作的规划中,施工项目的实施过程中可能会发生各种各样的事情,这些事情会导致施工时间的增加,从而使工程的完成时间变晚。可以通过加速实施来预测项目工作的延迟,但仍然要注意成本和质量因素。本研究分析了Indramayu Regency Eretan ROB搬运开发项目实施过程中,随着工作时间(加班时间)的增加(从加班1小时到加班3小时不等)以及使用时间成本权衡法增加人力,项目持续时间的加速。Rp的正常成本。20778458753和307天的时间与时间成本权衡的分析方法,得出最有效的加班时间是3小时的加班Rp成本。20275217792 244天的时间,最有效的劳动人力的补充3小时的加班Rp成本。20295750961年244年的时间。因此,最有效的分析结果是通过增加3小时的加班工作,与正常成本Rp. 503,240,961的差异,与正常持续时间63天的差异。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信