The Critical Path Method In Management Information System of Contractor Service Company Using Incremnetal Model

Hamim Tohari, A. Kudhori, H. Pandowo
{"title":"The Critical Path Method In Management Information System of Contractor Service Company Using Incremnetal Model","authors":"Hamim Tohari, A. Kudhori, H. Pandowo","doi":"10.36805/bit-cs.v4i1.2770","DOIUrl":null,"url":null,"abstract":"Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. XYZ Surabaya is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is one method that can be used to schedule projects. This study aims to design a project management information system by implementing CPM. The system design is done using the Incremental Model. The results of this study are in the form of a prototype system that fits the needs of CV. XYZ Surabaya, includes system flow, Contextual Data Model (CDM), and User Interface (UI).","PeriodicalId":389042,"journal":{"name":"Buana Information Technology and Computer Sciences (BIT and CS)","volume":"117 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Buana Information Technology and Computer Sciences (BIT and CS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36805/bit-cs.v4i1.2770","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. XYZ Surabaya is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is one method that can be used to schedule projects. This study aims to design a project management information system by implementing CPM. The system design is done using the Incremental Model. The results of this study are in the form of a prototype system that fits the needs of CV. XYZ Surabaya, includes system flow, Contextual Data Model (CDM), and User Interface (UI).
基于增量模型的承包商服务公司管理信息系统关键路径方法
管理项目需要良好的控制,从控制人力资源到系统的调度。简历。XYZ泗水是一家承包商服务公司,它还没有一个信息系统,可以用作项目管理中的控制工具。关键路径法(Critical Path Method, CPM)是一种可用于项目调度的方法。本研究旨在运用CPM设计一个专案管理资讯系统。系统设计采用增量模型。本研究的结果是一个原型系统的形式,适合CV的需要。XYZ Surabaya,包括系统流、上下文数据模型(CDM)和用户界面(UI)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信