Continuous-Trajectory Robust Unit Commitment Considering Beyond-the-Resolution Uncertainty

Bo Zhou, X. Ai, Jiakun Fang, W. Yao, J. Wen
{"title":"Continuous-Trajectory Robust Unit Commitment Considering Beyond-the-Resolution Uncertainty","authors":"Bo Zhou, X. Ai, Jiakun Fang, W. Yao, J. Wen","doi":"10.1109/PESGM41954.2020.9281606","DOIUrl":null,"url":null,"abstract":"To guarantee the operational security of the renewable power system, the uncertainty of renewable energy generation (REG) should be fully considered. However, the traditional robust unit commitment (RUC) cannot access the variation of REG inside the operational period. Hence, this paper proposes the continuous-trajectory (CT) RUC considering the beyond-the-resolution (BtR) uncertainty. The critical impact factors characterizing the BtR variation are analyzed, and then the BtR uncertainty is modeled. The mathematical formulation of CT-RUC is derived and shifted from the time domain to the time-dependent function space so that the optimization can be tractably solved. The comparison between traditional RUC and CT-RUC demonstrates that the consideration of the BtR uncertainty can result in a more robust solution.","PeriodicalId":106476,"journal":{"name":"2020 IEEE Power & Energy Society General Meeting (PESGM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE Power & Energy Society General Meeting (PESGM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESGM41954.2020.9281606","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

To guarantee the operational security of the renewable power system, the uncertainty of renewable energy generation (REG) should be fully considered. However, the traditional robust unit commitment (RUC) cannot access the variation of REG inside the operational period. Hence, this paper proposes the continuous-trajectory (CT) RUC considering the beyond-the-resolution (BtR) uncertainty. The critical impact factors characterizing the BtR variation are analyzed, and then the BtR uncertainty is modeled. The mathematical formulation of CT-RUC is derived and shifted from the time domain to the time-dependent function space so that the optimization can be tractably solved. The comparison between traditional RUC and CT-RUC demonstrates that the consideration of the BtR uncertainty can result in a more robust solution.
考虑超分辨率不确定性的连续轨迹鲁棒单元承诺
为保证可再生能源发电系统的运行安全,应充分考虑可再生能源发电的不确定性。然而,传统的鲁棒单元承诺(RUC)无法访问运行周期内REG的变化。因此,本文提出了考虑超分辨率不确定性的连续轨迹(CT) RUC。分析了表征BtR变化的关键影响因素,建立了BtR不确定性模型。推导了CT-RUC的数学表达式,并将其从时域转移到时变函数空间,从而使优化问题可跟踪求解。传统RUC和CT-RUC的比较表明,考虑BtR不确定性可以得到更鲁棒的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信