Internal risk assessment of whole process engineering consulting consortium based on GRA-TOPSIS-FMEA

Jinjian Du, Jianyu Chu
{"title":"Internal risk assessment of whole process engineering consulting consortium based on GRA-TOPSIS-FMEA","authors":"Jinjian Du, Jianyu Chu","doi":"10.21595/jmai.2023.23427","DOIUrl":null,"url":null,"abstract":"In order to select key risk factors, effectively control risks, and promote the smooth development of the whole process of engineering consulting consortium, Based on WBS-RBS risk identification in the whole process of engineering consulting, this paper introduces FMEA model, applies rough set and binary semantics to evaluate risk from multiple dimensions of occurrence, severity and difficulty to detect, and uses G1-improved CRITIC to calculate the comprehensive weight of risk evaluation factors, and then severity is revised based on DEMATEL. The GRA-TOPSIS model is constructed for risk ranking. Finally, the model is applied to a road network project and the analysis shows that communication and coordination risk, termination risk and schedule risk are the key risks. The model is suitable for risk assessment in the joint body and provides a feasible method for risk control in the whole process of engineering consulting consortia.","PeriodicalId":314911,"journal":{"name":"Journal of Mechatronics and Artificial Intelligence in Engineering","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mechatronics and Artificial Intelligence in Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21595/jmai.2023.23427","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In order to select key risk factors, effectively control risks, and promote the smooth development of the whole process of engineering consulting consortium, Based on WBS-RBS risk identification in the whole process of engineering consulting, this paper introduces FMEA model, applies rough set and binary semantics to evaluate risk from multiple dimensions of occurrence, severity and difficulty to detect, and uses G1-improved CRITIC to calculate the comprehensive weight of risk evaluation factors, and then severity is revised based on DEMATEL. The GRA-TOPSIS model is constructed for risk ranking. Finally, the model is applied to a road network project and the analysis shows that communication and coordination risk, termination risk and schedule risk are the key risks. The model is suitable for risk assessment in the joint body and provides a feasible method for risk control in the whole process of engineering consulting consortia.
基于GRA-TOPSIS-FMEA的全过程工程咨询联合体内部风险评估
为了选择关键风险因素,有效控制风险,促进工程咨询联合体全过程的顺利开展,基于工程咨询全过程的WBS-RBS风险识别,引入FMEA模型,应用粗糙集和二元语义从风险的发生、严重程度和检测难易度等多个维度对风险进行评价。并利用g1改进的CRITIC计算风险评价因子的综合权重,再根据DEMATEL修正严重程度。构建GRA-TOPSIS模型进行风险排序。最后,将该模型应用于某路网项目,分析表明沟通协调风险、终止风险和进度风险是关键风险。该模型适用于联合体的风险评估,为工程咨询联合体全过程的风险控制提供了一种可行的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信