Application of computer vision for construction progress monitoring

H. Moragane, B. Perera, A. D. Palihakkara
{"title":"Application of computer vision for construction progress monitoring","authors":"H. Moragane, B. Perera, A. D. Palihakkara","doi":"10.31705/wcs.2022.11","DOIUrl":null,"url":null,"abstract":"Progress monitoring of construction work is crucial to identify the discrepancies between the as-built product and as-planned design and take necessary action based on the results. Construction work is time consuming and labour intensive. However, the use of new technologies, such as computer vision (CV), in construction progress monitoring (CPM) can minimise human errors. Thus, the aim of this study was to explore the current applications of CV in the construction industry in general and in the different stages of CPM. A qualitative approach based on the Delphi technique comprising two interview rounds was used to collect the required data. The study findings revealed that CPM has seven stages: initial planning, data acquisition, information retrieval, verification, progress estimation and comparison, results visualisation and schedule updating. During these stages, CV can be used in various CPM activities, such as earthmoving operations, crane operations, formwork and rebar tracking, worker activity tracking, safety assurance, landscape identification, work item monitoring and integrating with other technologies. Familiarisation of the workforce with CV and research on the applications of CV in construction can help the construction industry to move with technology and be on par with other industries. This study would enable construction personnel to explore the possibility of applying CV in CPM. Further research on identifying the synergy between CV and CPM can be based on the study findings.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 10th World Construction Symposium 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31705/wcs.2022.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Progress monitoring of construction work is crucial to identify the discrepancies between the as-built product and as-planned design and take necessary action based on the results. Construction work is time consuming and labour intensive. However, the use of new technologies, such as computer vision (CV), in construction progress monitoring (CPM) can minimise human errors. Thus, the aim of this study was to explore the current applications of CV in the construction industry in general and in the different stages of CPM. A qualitative approach based on the Delphi technique comprising two interview rounds was used to collect the required data. The study findings revealed that CPM has seven stages: initial planning, data acquisition, information retrieval, verification, progress estimation and comparison, results visualisation and schedule updating. During these stages, CV can be used in various CPM activities, such as earthmoving operations, crane operations, formwork and rebar tracking, worker activity tracking, safety assurance, landscape identification, work item monitoring and integrating with other technologies. Familiarisation of the workforce with CV and research on the applications of CV in construction can help the construction industry to move with technology and be on par with other industries. This study would enable construction personnel to explore the possibility of applying CV in CPM. Further research on identifying the synergy between CV and CPM can be based on the study findings.
计算机视觉在施工进度监控中的应用
施工工作的进度监测对于识别建成产品与计划设计之间的差异并根据结果采取必要的行动至关重要。建筑工作耗时耗力。然而,在施工进度监测(CPM)中使用计算机视觉(CV)等新技术可以最大限度地减少人为错误。因此,本研究的目的是探讨目前CV在建筑行业的一般应用,以及在CPM的不同阶段。基于德尔菲技术的定性方法包括两轮访谈,用于收集所需的数据。研究结果表明,CPM有七个阶段:初始计划、数据获取、信息检索、验证、进度估计和比较、结果可视化和进度更新。在这些阶段,CV可用于各种CPM活动,如土方作业、起重机作业、模板和钢筋跟踪、工人活动跟踪、安全保证、景观识别、工作项目监控以及与其他技术的集成。让员工熟悉CV,并研究CV在建造业的应用,有助建造业跟上科技的步伐,与其他行业并驾齐驱。本研究将有助于建筑人员探索CV在CPM中应用的可能性。基于本研究结果,可以进一步研究CV与CPM之间的协同效应。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信