ANALISIS HEAD LOSSES PADA PENSTOCK UNIT III DI PERUM JASA TIRTA II UNIT JASA PEMBANGKIT PLTA IR. H. DJUANDA

R. Jurnal
{"title":"ANALISIS HEAD LOSSES PADA PENSTOCK UNIT III DI PERUM JASA TIRTA II UNIT JASA PEMBANGKIT PLTA IR. H. DJUANDA","authors":"R. Jurnal","doi":"10.33322/powerplant.v6i1.70","DOIUrl":null,"url":null,"abstract":"One of the power plants in the labor system is hydropower, which is a power plant by utilizing water resources as its working fluid. In the operation of the hydropower requires high reliability sothat the energy production contuinitas to the load center or to the power system network can be more optimum. One of the components in the hydropower plant is penstock. Closed pipeline, whether it is laminar or turbulent, must have head losses. Head losses on penstock is a phenomenon of losses on the penstock so as to make the head value on the hydropower becomes reduced. At Penstock unit III PLTA Ir. H. Djuanda there are two phenomenon of head losses, namely: head losses major caused by friction penstock against water and minor head losses in the form of bend 900 with radius 4.375 m and 11.3 m from the axis penstock. Temperature changes affect the size of head losses, but they do not significantly affect penstock efficiency. At a temperature of 240C and a flow rate of 5m / s obtained a total head losses of 0606 m so as to make the potential of turbine inlet power down to 31,247 MW or 99.21%.","PeriodicalId":293768,"journal":{"name":"Power Plant","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Plant","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33322/powerplant.v6i1.70","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

One of the power plants in the labor system is hydropower, which is a power plant by utilizing water resources as its working fluid. In the operation of the hydropower requires high reliability sothat the energy production contuinitas to the load center or to the power system network can be more optimum. One of the components in the hydropower plant is penstock. Closed pipeline, whether it is laminar or turbulent, must have head losses. Head losses on penstock is a phenomenon of losses on the penstock so as to make the head value on the hydropower becomes reduced. At Penstock unit III PLTA Ir. H. Djuanda there are two phenomenon of head losses, namely: head losses major caused by friction penstock against water and minor head losses in the form of bend 900 with radius 4.375 m and 11.3 m from the axis penstock. Temperature changes affect the size of head losses, but they do not significantly affect penstock efficiency. At a temperature of 240C and a flow rate of 5m / s obtained a total head losses of 0606 m so as to make the potential of turbine inlet power down to 31,247 MW or 99.21%.
劳动系统的动力之一是水力发电,它是利用水资源作为工作流体的动力装置。水电在运行中对可靠性要求很高,这样才能使发电持续向负荷中心或电网输送更优。水电厂的部件之一是压力管。封闭管道,无论是层流还是湍流,都必须有水头损失。压力管水头损失是压力管发生损失,使水力发电的水头值降低的一种现象。在Penstock单元III PLTA Ir。H. Djuanda水头损失有两种现象,即水头损失主要是由于压力管与水的摩擦造成的,次要的水头损失以弯头900的形式出现,弯头900的半径为4.375 m,距离轴向压力管11.3 m。温度变化影响水头损失的大小,但对压力管效率影响不显著。在温度为240C,流量为5m / s时,水头总损失为0606 m,从而使涡轮进口功率的潜力降至31247 MW或99.21%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信