Determining Highway Toll: Revenue Maximization Approach

Stergios Gousios, Nicholas J. Mazzenga, B. Park
{"title":"Determining Highway Toll: Revenue Maximization Approach","authors":"Stergios Gousios, Nicholas J. Mazzenga, B. Park","doi":"10.1109/ITSC.2007.4357690","DOIUrl":null,"url":null,"abstract":"Constructions and operations of toll roads under private and public partnerships (PPP) have been quite successful as the partnerships have added more roadways and provided faster travel time for those who are willing to pay for additional fee. So far, toll rates have been determined on the basis of marginal social cost pricing concept, recovering construction and maintenance costs within a reasonable duration, or political determination. Under the PPP, the private partners would like to achieve maximum revenue on their toll roads. This paper presents a flexible and real-time toll rate determination method that is focused on revenue maximization approach via a case study.","PeriodicalId":211095,"journal":{"name":"2007 IEEE Intelligent Transportation Systems Conference","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2007-10-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Intelligent Transportation Systems Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITSC.2007.4357690","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Constructions and operations of toll roads under private and public partnerships (PPP) have been quite successful as the partnerships have added more roadways and provided faster travel time for those who are willing to pay for additional fee. So far, toll rates have been determined on the basis of marginal social cost pricing concept, recovering construction and maintenance costs within a reasonable duration, or political determination. Under the PPP, the private partners would like to achieve maximum revenue on their toll roads. This paper presents a flexible and real-time toll rate determination method that is focused on revenue maximization approach via a case study.
确定高速公路收费:收益最大化方法
公私合作伙伴关系(PPP)下收费公路的建设和运营相当成功,因为合作伙伴关系增加了更多的道路,并为那些愿意支付额外费用的人提供了更快的旅行时间。迄今为止,通行费的确定主要基于边际社会成本定价概念、在合理期限内收回建设和维护成本或政治决定。在PPP模式下,私人合作伙伴希望在收费公路上获得最大的收入。本文通过一个案例研究,提出了一种以收益最大化为目标的灵活、实时的收费率确定方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信