{"title":"Development of the intelligent dispatching system for power grid: an example of the virtual dispatcher for the Lanzhou power grid","authors":"Yugang Zhang, Fayuan Gao, Wenwu Zhang, H. Ma, Shicheng Jiang, Chunlin Chen","doi":"10.1117/12.2673480","DOIUrl":null,"url":null,"abstract":"With the gradual expansion of the power grid scale, the complexity of the power grid becomes higher and higher, and the stable operation and dispatching of the power grid become more and more difficult. The application of artificial intelligence to power grid dispatching can make the process of power grid dispatching simple and efficient. Moreover, it is an effective way to solve the difficulties of power grid dispatching. Taking the virtual dispatcher in the Lanzhou power grid system as an example, the application of artificial intelligence system in the power grid control was summarized. Combined with the actual situation of the Lanzhou power grid, the necessity and feasibility of the development of the power grid intelligent dispatching system were fully analyzed, and the concrete implementation steps and methods of the development of the power grid intelligent dispatching system were illustrated by examples. This work can provide a reference for the development of an intelligent dispatching system and intelligent upgrade of the power grid.","PeriodicalId":176918,"journal":{"name":"2nd International Conference on Digital Society and Intelligent Systems (DSInS 2022)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2nd International Conference on Digital Society and Intelligent Systems (DSInS 2022)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2673480","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
With the gradual expansion of the power grid scale, the complexity of the power grid becomes higher and higher, and the stable operation and dispatching of the power grid become more and more difficult. The application of artificial intelligence to power grid dispatching can make the process of power grid dispatching simple and efficient. Moreover, it is an effective way to solve the difficulties of power grid dispatching. Taking the virtual dispatcher in the Lanzhou power grid system as an example, the application of artificial intelligence system in the power grid control was summarized. Combined with the actual situation of the Lanzhou power grid, the necessity and feasibility of the development of the power grid intelligent dispatching system were fully analyzed, and the concrete implementation steps and methods of the development of the power grid intelligent dispatching system were illustrated by examples. This work can provide a reference for the development of an intelligent dispatching system and intelligent upgrade of the power grid.