{"title":"10kW rapid-charger for electric vehicle considering vehicle to grid(V2G)","authors":"Ga-Gang Choi, Doo-yong Jung, Sung-chon Choi, C. Won, Yong-Chae Jung, Jang-Hyoun Youm","doi":"10.1109/IPEMC.2012.6259283","DOIUrl":null,"url":null,"abstract":"Because of the quantity of demand power depends on the power consumption of power demands on the loads, the utility grid has to secure a supply of electric energy which is larger than the required power consumption under peak load-condition. It means that the waste of electric power could be heavy at the other time than peak-load period. To avoid the waste of power, a 10kW rapid-charger system which has a function of load compensation at the peak-load condition is proposed in this paper. At the peak-load condition, the rapid charger transfer charged energy in the battery of electric vehicle to the grid. The 10kW rapid-charger for electric vehicle is comprised of the three-phase AC-DC PWM converter and isolated bidirectional DC-DC converter. Proposed V2G operation is verified through simulation experiment performed by 10kW rapid-charger.","PeriodicalId":236136,"journal":{"name":"Proceedings of The 7th International Power Electronics and Motion Control Conference","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of The 7th International Power Electronics and Motion Control Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPEMC.2012.6259283","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

Because of the quantity of demand power depends on the power consumption of power demands on the loads, the utility grid has to secure a supply of electric energy which is larger than the required power consumption under peak load-condition. It means that the waste of electric power could be heavy at the other time than peak-load period. To avoid the waste of power, a 10kW rapid-charger system which has a function of load compensation at the peak-load condition is proposed in this paper. At the peak-load condition, the rapid charger transfer charged energy in the battery of electric vehicle to the grid. The 10kW rapid-charger for electric vehicle is comprised of the three-phase AC-DC PWM converter and isolated bidirectional DC-DC converter. Proposed V2G operation is verified through simulation experiment performed by 10kW rapid-charger.
考虑车辆到电网的10kW电动汽车快速充电器(V2G)
由于电力需求对负荷的耗电量取决于电力需求对负荷的耗电量,因此电网必须保证峰值负荷条件下大于所需耗电量的电力供应。这意味着,在非高峰负荷时段,电力的浪费可能更大。为了避免电力的浪费,本文提出了一种具有峰值负荷补偿功能的10kW快速充电系统。在峰值负荷工况下,快速充电器将电动汽车电池中的充电能量输送到电网中。10kW电动汽车快速充电器由三相交直流PWM变换器和隔离式双向DC-DC变换器组成。通过10kW快速充电器的仿真实验验证了所提出的V2G运行方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信