{"title":"Methodological Proposal to Determine the Mobile Reserve of Power Transformers Considering Risks and Uncertainties","authors":"R. Quintana, Carlos Quispe","doi":"10.1109/ACEEE56193.2022.9851833","DOIUrl":null,"url":null,"abstract":"In this article, it's proposed to analyze and present an alternative that allows to determine the transformation reserve in the electric transmission, through a methodology based on the Poisson distribution associated with the economic justification criterion; proposing it as a proposal to be applied in the planning processes of the expansion of the sub-transmission. One of the key issues in planning the expansion of the transmission system, is reliability and safety, which has recently been included in the regulation of transmission in Peru; Risk assessment is an effective instrument to help the decision process for the management of power transformers. There are few practical methodologies for evaluating spare transformers. In addition, such proposals do not necessarily take into account the costs that represent the system, either by under-sizing or over-sizing the reserve. According to the above, it is necessary to establish a methodology to balance the cost that would represent to make investments for the acquisition of the reserve transformers, and the benefits that would provide the reliability of the system against such purchases. Consequently, a methodology is proposed to determine the reserve of power transformers, considering risks and uncertainties, this proposal could contribute to the development of the planning of the expansion of the sub transmission in Peru.","PeriodicalId":142893,"journal":{"name":"2022 5th Asia Conference on Energy and Electrical Engineering (ACEEE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 5th Asia Conference on Energy and Electrical Engineering (ACEEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACEEE56193.2022.9851833","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In this article, it's proposed to analyze and present an alternative that allows to determine the transformation reserve in the electric transmission, through a methodology based on the Poisson distribution associated with the economic justification criterion; proposing it as a proposal to be applied in the planning processes of the expansion of the sub-transmission. One of the key issues in planning the expansion of the transmission system, is reliability and safety, which has recently been included in the regulation of transmission in Peru; Risk assessment is an effective instrument to help the decision process for the management of power transformers. There are few practical methodologies for evaluating spare transformers. In addition, such proposals do not necessarily take into account the costs that represent the system, either by under-sizing or over-sizing the reserve. According to the above, it is necessary to establish a methodology to balance the cost that would represent to make investments for the acquisition of the reserve transformers, and the benefits that would provide the reliability of the system against such purchases. Consequently, a methodology is proposed to determine the reserve of power transformers, considering risks and uncertainties, this proposal could contribute to the development of the planning of the expansion of the sub transmission in Peru.
考虑风险和不确定性确定电力变压器移动备用的方法建议
在本文中,建议分析并提出一种替代方案,允许通过基于泊松分布与经济合理性标准相关联的方法来确定电力传输中的转换储备;建议将其作为一项建议应用于子输电扩建的规划过程中。规划扩大输电系统的关键问题之一是可靠性和安全性,秘鲁最近已将其纳入输电管理;风险评估是帮助电力变压器管理决策的有效工具。评估备用变压器的实用方法很少。此外,这些建议并不一定考虑到代表系统的费用,无论是减少或增加储备金。根据上述情况,有必要建立一种方法来平衡为购买备用变压器而进行投资的成本,以及为购买备用变压器而提供系统可靠性的收益。因此,提出了一种方法来确定电力变压器的储备,考虑到风险和不确定性,这一建议可能有助于秘鲁扩展输电规划的发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信