A probabilistic model for clock skew

Steven D. Kugelmass, K. Steiglitz
{"title":"A probabilistic model for clock skew","authors":"Steven D. Kugelmass, K. Steiglitz","doi":"10.1109/ARRAYS.1988.18091","DOIUrl":null,"url":null,"abstract":"A probabilistic model for the accumulation of clock skew in synchronous systems is presented. The model is used to derive upper bounds for expected skew and its variance, in tree distribution systems with N synchronously clocked processing elements. The results are applied to two specific models for clock distribution. In the first, which is called metric-free, the skew in a buffer stage is Gaussian with a variance independent of wire length. The second, metric, model, is intended to reflect VLSI constraints: the clock skew in a stage is Gaussian with a variance proportional to wire length, and the distribution tree is an H-tree embedded in the plane. Upper bounds on skew are obtained for both models. Estimates of the constants of proportionality as well as the asymptotic behavior have been obtained and verified by simulation.<<ETX>>","PeriodicalId":339807,"journal":{"name":"[1988] Proceedings. International Conference on Systolic Arrays","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1988] Proceedings. International Conference on Systolic Arrays","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ARRAYS.1988.18091","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

A probabilistic model for the accumulation of clock skew in synchronous systems is presented. The model is used to derive upper bounds for expected skew and its variance, in tree distribution systems with N synchronously clocked processing elements. The results are applied to two specific models for clock distribution. In the first, which is called metric-free, the skew in a buffer stage is Gaussian with a variance independent of wire length. The second, metric, model, is intended to reflect VLSI constraints: the clock skew in a stage is Gaussian with a variance proportional to wire length, and the distribution tree is an H-tree embedded in the plane. Upper bounds on skew are obtained for both models. Estimates of the constants of proportionality as well as the asymptotic behavior have been obtained and verified by simulation.<>
时钟偏差的概率模型
提出了同步系统中时钟偏差积累的概率模型。该模型用于推导具有N个同步时钟处理元素的树分布系统的期望偏差及其方差的上界。结果应用于两个特定的时钟分布模型。在第一种情况下,称为无度量,缓冲阶段的偏差是高斯的,其方差与导线长度无关。第二个是度量模型,旨在反映VLSI的约束:阶段中的时钟偏差是高斯的,方差与导线长度成正比,分布树是嵌入在平面中的h树。得到了两种模型的偏度上界。得到了比例常数和渐近特性的估计,并通过仿真进行了验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信