The proposition of Process flow model for Scrum and eXtreme Programming

S. Merzouk, A. Cherkaoui, A. Marzak, N. Sael, Fatima Zahra Guerss
{"title":"The proposition of Process flow model for Scrum and eXtreme Programming","authors":"S. Merzouk, A. Cherkaoui, A. Marzak, N. Sael, Fatima Zahra Guerss","doi":"10.1145/3454127.3457627","DOIUrl":null,"url":null,"abstract":"To carry out a quality project, the company collaborators need to rely on an efficient management methodology. It is the key to organize the project in a structured and streamlined manner, it helps the team to be more structured. The traditional methods are usually used on projects based on very precise ideas with very detailed specifications and planning which anticipated all possible risks. Nevertheless, these do not allow any kind of interaction with the customer, who will receive the project once it is finished. For that reason, solutions like eXtreme Programming and Scrum have been proposed by project management experts respecting the interaction with the customer, ability to change, and so on. These methods share the same values and principles, but each one has its own singularities. In this paper, we will present the process flow model of the Scrum and XP methods. For this process flow model, we used the BPMN models.","PeriodicalId":432206,"journal":{"name":"Proceedings of the 4th International Conference on Networking, Information Systems & Security","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 4th International Conference on Networking, Information Systems & Security","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3454127.3457627","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

To carry out a quality project, the company collaborators need to rely on an efficient management methodology. It is the key to organize the project in a structured and streamlined manner, it helps the team to be more structured. The traditional methods are usually used on projects based on very precise ideas with very detailed specifications and planning which anticipated all possible risks. Nevertheless, these do not allow any kind of interaction with the customer, who will receive the project once it is finished. For that reason, solutions like eXtreme Programming and Scrum have been proposed by project management experts respecting the interaction with the customer, ability to change, and so on. These methods share the same values and principles, but each one has its own singularities. In this paper, we will present the process flow model of the Scrum and XP methods. For this process flow model, we used the BPMN models.
面向Scrum和极限编程的流程流模型的提出
为了执行高质量的项目,公司合作者需要依靠有效的管理方法。以结构化和流线型的方式组织项目是关键,它有助于团队更加结构化。传统方法通常用于基于非常精确的想法,非常详细的规格和计划的项目,预测所有可能的风险。然而,这些不允许与客户进行任何形式的交互,客户将在项目完成后接收项目。出于这个原因,项目管理专家提出了一些解决方案,比如极限编程和Scrum,这些解决方案尊重与客户的交互、改变的能力等等。这些方法具有相同的价值和原则,但每个方法都有自己的独特性。在本文中,我们将介绍Scrum和XP方法的流程流模型。对于这个流程流模型,我们使用了BPMN模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信