Coupling Wind Generators with Deferrable Loads

A. Papavasiliou, S. Oren
{"title":"Coupling Wind Generators with Deferrable Loads","authors":"A. Papavasiliou, S. Oren","doi":"10.1109/ENERGY.2008.4781058","DOIUrl":null,"url":null,"abstract":"We explore the possibility of directly coupling deferrable loads with wind generators in order to mitigate the variability and randomness of wind power generation. Loads engage in a contractual agreement of deferring their demand for power by a fixed amount of time and wind generators optimally allocate available wind power with the objective of minimizing the cost of unscheduled and variable supply. We simulate the performance of the proposed coupling in a market environment and we demonstrate its compatibility with existing technology, grid operations and economic incentives. The results indicate that the combination of existing deregulated power markets and demand side flexibility could support large scale integration of wind power without significant impacts on grid operations and without the requirement for prohibitive investments in backup generation.","PeriodicalId":240093,"journal":{"name":"2008 IEEE Energy 2030 Conference","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"56","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE Energy 2030 Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGY.2008.4781058","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 56

Abstract

We explore the possibility of directly coupling deferrable loads with wind generators in order to mitigate the variability and randomness of wind power generation. Loads engage in a contractual agreement of deferring their demand for power by a fixed amount of time and wind generators optimally allocate available wind power with the objective of minimizing the cost of unscheduled and variable supply. We simulate the performance of the proposed coupling in a market environment and we demonstrate its compatibility with existing technology, grid operations and economic incentives. The results indicate that the combination of existing deregulated power markets and demand side flexibility could support large scale integration of wind power without significant impacts on grid operations and without the requirement for prohibitive investments in backup generation.
具有可延迟负荷的耦合风力发电机
为了减轻风力发电的可变性和随机性,我们探讨了将可延负荷与风力发电机直接耦合的可能性。负荷签订合同协议,将其电力需求推迟一段固定的时间,风力发电机以最大限度地减少计划外和可变供应的成本为目标,优化分配可用的风力。我们在市场环境中模拟了所提出的耦合的性能,并证明了它与现有技术、电网运行和经济激励的兼容性。结果表明,现有的放松管制的电力市场和需求侧灵活性的结合可以支持大规模的风力发电整合,而不会对电网运行产生重大影响,也不需要对备用发电进行巨额投资。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信