{"title":"Cost estimating - Make or Buy?","authors":"T. Montgomery","doi":"10.28945/3649","DOIUrl":null,"url":null,"abstract":"Troy Montgomery, a consultant at Humana in April of 2015, was tasked with providing leaders of Humana’s corporate real estate group, Workplace Solutions (WPS), with an answer as to how to provide early cost estimates on large construction projects. Should they create a solution internally, outsource development of a solution, or look to an existing solution to provide a “cost calculator”? There was so much variation in the types of projects WPS worked on, not to mention an assortment of internal clients they served. Such complexity made it virtually impossible to come to a straight forward recommendation.","PeriodicalId":202502,"journal":{"name":"J. Inf. Technol. Educ. Discuss. Cases","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-01-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"J. Inf. Technol. Educ. Discuss. Cases","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.28945/3649","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Troy Montgomery, a consultant at Humana in April of 2015, was tasked with providing leaders of Humana’s corporate real estate group, Workplace Solutions (WPS), with an answer as to how to provide early cost estimates on large construction projects. Should they create a solution internally, outsource development of a solution, or look to an existing solution to provide a “cost calculator”? There was so much variation in the types of projects WPS worked on, not to mention an assortment of internal clients they served. Such complexity made it virtually impossible to come to a straight forward recommendation.
成本估算——制造还是购买?
特洛伊•蒙哥马利(Troy Montgomery)是Humana的顾问,2015年4月,他接到了一项任务,为Humana旗下企业房地产集团Workplace Solutions (WPS)的领导人提供一个如何为大型建筑项目提供早期成本估算的答案。他们应该在内部创建解决方案,外包解决方案的开发,还是寻找现有的解决方案来提供“成本计算器”?WPS所从事的项目类型千差万别,更不用说他们所服务的各种内部客户了。这种复杂性实际上使我们不可能提出一个直截了当的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信