Power system for NSTX upgrade

S. Ramakrishnan, C. Neumeyer, J. Lawson, R. Mozulay, E. Baker, R. Hatcher, N. Desai, W. Que, Xin Zhao
{"title":"Power system for NSTX upgrade","authors":"S. Ramakrishnan, C. Neumeyer, J. Lawson, R. Mozulay, E. Baker, R. Hatcher, N. Desai, W. Que, Xin Zhao","doi":"10.1109/SOFE.2011.6052347","DOIUrl":null,"url":null,"abstract":"This The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. At present, the NSTX power system is feeding thirteen (13) circuits from the Power converters. An upgrade of the NSTX center stack is proposed. This entails a much higher Toroidal Field Current from 71.2kA to 129.8kA, and requires major configuration changes including doubling the number of parallel strings of rectifiers along with associated power loop changes. Also, three additional coils will be installed in the machine. The control and protection of the rectifiers have to be replaced to reflect state of the art features to enhance the performance. This paper describes the details of the proposed Power system for NSTX upgrade.","PeriodicalId":393592,"journal":{"name":"2011 IEEE/NPSS 24th Symposium on Fusion Engineering","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE/NPSS 24th Symposium on Fusion Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SOFE.2011.6052347","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

This The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. At present, the NSTX power system is feeding thirteen (13) circuits from the Power converters. An upgrade of the NSTX center stack is proposed. This entails a much higher Toroidal Field Current from 71.2kA to 129.8kA, and requires major configuration changes including doubling the number of parallel strings of rectifiers along with associated power loop changes. Also, three additional coils will be installed in the machine. The control and protection of the rectifiers have to be replaced to reflect state of the art features to enhance the performance. This paper describes the details of the proposed Power system for NSTX upgrade.
NSTX升级电源系统
这个国家球面环面实验(NSTX)是在普林斯顿等离子体物理实验室(PPPL)的现有设施中设计和安装的。最初用于托卡马克聚变试验反应堆(TFTR)的大多数硬件、工厂设施、辅助子系统和动力系统都经过了适当的修改,以反映NSTX的需求。目前,NSTX电力系统从电源转换器馈电十三(13)个电路。提出了NSTX中心栈的升级方案。这需要更高的环向场电流,从71.2kA到129.8kA,并且需要进行重大配置更改,包括将并联整流器串的数量增加一倍以及相关的电源环路更改。此外,三个额外的线圈将安装在机器上。必须更换整流器的控制和保护,以反映最先进的特征,以提高性能。本文详细介绍了NSTX升级的电力系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信