{"title":"Strategies on the immediate assignment procedure within the GSM call setup scenario","authors":"J.N. Ku","doi":"10.1109/VETEC.1992.245307","DOIUrl":null,"url":null,"abstract":"In the call setup implementation of a cellular system, there are two design choices for the immediate assignment procedure: (1) assign a traffic channel and (2) assign a stand-alone dedicated control channel. A simulation was run to analyze which option would give a better system performance in terms of number of attempts blocked and channel utilization. The results of the simulation demonstrated that it is a tradeoff between the performance of the call setup time and the channel capacity in each cell.<<ETX>>","PeriodicalId":114705,"journal":{"name":"[1992 Proceedings] Vehicular Technology Society 42nd VTS Conference - Frontiers of Technology","volume":"174 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1992 Proceedings] Vehicular Technology Society 42nd VTS Conference - Frontiers of Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VETEC.1992.245307","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In the call setup implementation of a cellular system, there are two design choices for the immediate assignment procedure: (1) assign a traffic channel and (2) assign a stand-alone dedicated control channel. A simulation was run to analyze which option would give a better system performance in terms of number of attempts blocked and channel utilization. The results of the simulation demonstrated that it is a tradeoff between the performance of the call setup time and the channel capacity in each cell.<>