An approach for project risk evaluation based on linguistic assessment information

Guo Jian, Jia Chuang-liang, L. Ai-hua
{"title":"An approach for project risk evaluation based on linguistic assessment information","authors":"Guo Jian, Jia Chuang-liang, L. Ai-hua","doi":"10.1109/ICIME.2010.5478165","DOIUrl":null,"url":null,"abstract":"Project risk evaluation is the basis of project risk management, and it is the sticking point of the successful project implementation. In this paper, a group decision making approach based on multi-granularity linguistic assessment information is used to evaluate the project risk. The linguistic 2-tuple representation model and computing model are taken for dealing with multi-granular linguistic assessment information. Firstly, the experts linguistic assessment information is represented in the form of 2-tuple. Secondly, the basic linguistic term set is chosen from multi-granularity, linguistic term sets and the computational formulae are given to uniform the multi-granular linguistic assessment information into the normalized representation of the 2-tuple linguistic. Then, the experts' weights in each attribute are obtained, and the group evaluation results of the project risk are determined according to an optimization model. Finally, a numerical example of ERP project illustrates the effectiveness of the proposed approach.","PeriodicalId":382705,"journal":{"name":"2010 2nd IEEE International Conference on Information Management and Engineering","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-04-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 2nd IEEE International Conference on Information Management and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIME.2010.5478165","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Project risk evaluation is the basis of project risk management, and it is the sticking point of the successful project implementation. In this paper, a group decision making approach based on multi-granularity linguistic assessment information is used to evaluate the project risk. The linguistic 2-tuple representation model and computing model are taken for dealing with multi-granular linguistic assessment information. Firstly, the experts linguistic assessment information is represented in the form of 2-tuple. Secondly, the basic linguistic term set is chosen from multi-granularity, linguistic term sets and the computational formulae are given to uniform the multi-granular linguistic assessment information into the normalized representation of the 2-tuple linguistic. Then, the experts' weights in each attribute are obtained, and the group evaluation results of the project risk are determined according to an optimization model. Finally, a numerical example of ERP project illustrates the effectiveness of the proposed approach.
基于语言评价信息的项目风险评价方法
项目风险评价是项目风险管理的基础,是项目成功实施的关键。本文采用基于多粒度语言评估信息的群体决策方法对项目风险进行评估。采用语言二元组表示模型和计算模型处理多粒度语言评价信息。首先,将专家语言评价信息以二元组的形式表示。其次,从多粒度中选择基本语言项集,给出语言项集和计算公式,将多粒度语言评价信息统一为二元组语言的规范化表示;然后,得到专家在各属性中的权重,根据优化模型确定项目风险的群体评价结果。最后,通过一个ERP项目的算例说明了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信