Challenges for special protection systems in the Chilean electricity market

A. De La Quintana, R. Palma-Behnke
{"title":"Challenges for special protection systems in the Chilean electricity market","authors":"A. De La Quintana, R. Palma-Behnke","doi":"10.1109/PESMG.2013.6672673","DOIUrl":null,"url":null,"abstract":"The Chilean electricity market, formally established in 1982, has a classical Pool type structure, with auditable costs and centralized operations. During its history, the Chilean electricity system has faced high growth rates in energy demands, transmission congestions, this along with a system expansion based on probabilistic criteria incorporated in its economic assessments. In this context, economic opportunities have been created in order to introduce levels of flexibility, by means of special protection schemes (SPS). This paper presents the development of these SPSs, distinguishing economic motivations and technical design criteria. A classification of the different types of SPSs is proposed. Also, the advantages and disadvantages of the different solutions are being presented through application examples. Finally, the future challenges in this field are presented.","PeriodicalId":433870,"journal":{"name":"2013 IEEE Power & Energy Society General Meeting","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE Power & Energy Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESMG.2013.6672673","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

The Chilean electricity market, formally established in 1982, has a classical Pool type structure, with auditable costs and centralized operations. During its history, the Chilean electricity system has faced high growth rates in energy demands, transmission congestions, this along with a system expansion based on probabilistic criteria incorporated in its economic assessments. In this context, economic opportunities have been created in order to introduce levels of flexibility, by means of special protection schemes (SPS). This paper presents the development of these SPSs, distinguishing economic motivations and technical design criteria. A classification of the different types of SPSs is proposed. Also, the advantages and disadvantages of the different solutions are being presented through application examples. Finally, the future challenges in this field are presented.
智利电力市场特殊保护系统面临的挑战
智利电力市场于1982年正式建立,具有典型的池式结构,成本可审计,集中运营。在其历史上,智利电力系统面临着能源需求的高速增长,传输拥堵,以及基于其经济评估中纳入的概率标准的系统扩展。在这方面,创造了经济机会,以便通过特别保护计划(SPS)实行各种程度的灵活性。本文介绍了这些SPSs的发展,区分了经济动机和技术设计标准。对不同类型的SPSs进行了分类。此外,还通过应用实例介绍了不同解决方案的优缺点。最后,提出了该领域未来面临的挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信